1 |
GI Sri Siak Indrapura
& GI Perawang |
Topografi & Soil
Investigation |
2018 |
PT. Twink
Indonesia
|
PT. PLN |
2 |
150kV Rantau Prapat & Labuhan Bilik |
Earthing Grid Calulation and BOQ Earthing Material |
2018 |
PT. Gridtech Indonesia |
PT. PLN UIP2 Medan |
3 |
GI Sri Siak Indrapura & GI Perawang |
Topografi & Soil Investigation |
2018 |
PT. Twink Indonesia |
PT. PLN |
4 |
150kV Rantau Prapat & Labuhan Bilik |
Earthing Grid Calulation and BOQ Earthing Material |
2018 |
PT Gridtech Indonesia |
PT PLN UIP2 Medan |
5 |
GITET 275/150kV Sungai Rumbai |
Engineering Drawing (ED) & Civil Control Building GITET275/150kV Sungai Rumbai |
2018 |
PT. TWINK INDONESIA |
PT. PLN UIP SBT |
6 |
150kV GI Muara Rupit & 150 kV GI Sarolangon |
Detail Engineering Design (DED) Elektro (EM). |
2018 |
PT. GRIDTECH |
PT. PLN SBS (Sumatera Bagian Selatan ) |
7 |
150kV GIS Sario (new) & 150kV GIS Telling (extention) Sulawesi |
150kV GIS Sario (new) & 150kV GISTelling (extention)Detail Engineering Design (DED) Elektro Mechanical(EM) & Sipil |
2018 |
PT. CG Power System Indonesia |
PT. PLN UIP Sulawesi Bagian Utara |
8 |
GIS 150kV Bandara Bali, Bali |
Konstruksi & Testing Commisioning GIS150kV Bandara Bali, Bali |
2018 |
PT. Wisma Sarana Teknik |
PT. PLN Bandara Bali, Bali |
9 |
150kV APLN Lot 1 Sumatera (scattered) |
150kV APLN Lot 1(16 substations) Soil Test for 16substations & Detail Engineering Design (DED) sipil & structure |
2018 |
PT. CG Power System Indonesia |
PT. PLN UIPSBU, PT. PLNUIP SBT, & PT.PLN UIP SBS |
10 |
Pembangunan GIS150kV Nusa Dua |
Erection & Wiring Peralatan Electrical - Mechanical GIS -2 bay |
2018 |
KSO PT. Wisma Sarana Teknik - PT. Kencana Alam Putra |
PT. PLN Nusa Dua - Bali |